PROJECT : DEIRA MALL, THE PALM DEIRA, DUBAI
DESCRIPTION : GF-1ST-2ND-LOWER ROOF & UPPER ROOF WITH RETRACTABLE ROOF, NORTH AND SOUTH PARKING WITH TOTAL BUILT UP AREA OF 745,814 SQMT
LOCATION : DUBAI – DEIRA ISLANDS
CLIENT : NAKHEEL
CONSULTANT : TJEG & RSP
MAIN CONTRACTOR : UNITED ENGINEERING CONSTRUCTION LLC
COMPLETION : SUSPENDED BY CLIENT – PROJECT CANCELLED
VALUE IN DHS. : 277,200,000.00
SCOPE OF WORKS
- HVAC
The works include supply, installation, testing & commissioning of Blower coil units, fresh air handling units, Energy recovery ventilation unit, fan coil units & toilet extract fans with all associated duct works, pipe works and controls. Chilled water for the project (total cooling load of 36,400 TR) is fed from Via district cooling plant.
- Plumbing
The works includes supply, installation, testing & commissioning of network piping, automatic grease trap interceptors, siphonic rain water system, heat tracing for kitchen pipes, booster pump sets, sanitary wares & accessories, rain water collection and drainage systems with all associated pipe works.
- LPG
The works includes supply, installation, testing & commissioning network pipes, panels and detectors, 2 nos. of tanks with a capacity of 52,000L each.
- BMS System
The works includes supply, installation, testing & commissioning of cabling, BTU meters, sensors, other field devices and control stations.